We do what we say we’re going to do.

Two-story sales area at the Appalachian State University Campus Store, with wood-slat App State A walls and a mountain sunset mural

Institutional

Appalachian State University Campus Store

A comprehensive renovation of the first-floor retail and service space at the heart of App State's campus, built to grow the sales that fund student scholarships.

Client
Appalachian State University
Location
Boone, NC
Size
15,000+ sq ft
Sector
Higher education
Hayco role
General contractor

Project Overview

Rebuilt to sell more, without closing its doors

The Campus Store sits at the heart of Appalachian State's campus in the Plemmons Student Union, and its sales help fund student scholarships. The goal was a store that serves students better and sells more.

Hayco was general contractor for the comprehensive renovation of more than 15,000 square feet of first-floor retail and service space, built from construction documents by Jenkins Peer Architects. The store kept serving students from its second floor throughout construction.

Open steel stair and wood-slat feature wall with the App State A beside the entrance to The Market
Owner
Appalachian State University
Architect
Jenkins Peer Architects
Building
Plemmons Student Union

Scope of Work

What changed on the first floor

  1. 01

    Retail and service floor

    More than 15,000 sq ft of first-floor retail and service space, rebuilt around current retail practice.

  2. 02

    Checkout at both entrances

    Separate register stations beside each entrance to speed up checkout.

  3. 03

    Digital signage and sound

    New digital signage displays and a new sound system across the sales floor.

  4. 04

    Flooring and lighting

    New flooring and new lighting fixtures throughout the first floor.

  5. 05

    Environmental graphics

    Graphics that carry App State's campus culture and High Country setting into the store.

  6. 06

    Open for business upstairs

    Apparel, tech, textbook rental and AppCard services moved upstairs so the store kept serving students.

By the Numbers

15,000+
Sq ft of first-floor space renovated
225
Days from construction start to soft opening
3
App State projects delivered by Hayco
1969
Year the two-story store was built

Project Timeline

Built in under eight months

Construction ran through the spring semester and the summer, with the store operating from its second floor until the first floor reopened in August.

  1. Nov 2022

    Documents final

    Plans by Jenkins Peer Architects are finalized.

  2. Dec 19, 2022

    Construction starts

    First-floor departments move upstairs.

  3. Aug 1, 2023

    Soft opening

    The new first floor opens to students.

  4. Aug 9, 2023

    Grand reopening

    Ahead of the fall semester.

Start a Project

Planning work on an occupied campus?

Tell us the building, the window you have to work inside and who stays in the space while you build. A preconstruction lead will follow up.

Or call 336-444-4448