ALLEGACY FEDERAL CREDIT UNION

Allegacy Federal Credit Union is an interior upfit of its newest location in Mocksville, North Carolina. The Triad-based credit union is relocating to the Mocksville Financial Center to a 2,000-square-foot-space upon completion of an upfit to include remodeling the teller and office areas with modern enhancements, as well as exterior ATM and drive-thru additions.
Continue Reading

CAPITAL ANIMAL HOSPITAL

This project is for the addition of a new Surgery Suite as well as around 2,500 square feet of interior renovations to an existing veterinarian animal hospital. Minor exterior upgrades were executed alongside the interior upfit, including new finishes and a revamped storefront entrance with an awning and accessible walkway for patient discharges. Site improvements included upgrades to hardscapes, landscaping, parking lot as well as the creation of a pet yard for relief of patients prior to being admitted for surgery procedures.
Continue Reading

THIRSTY SOULS

This upfit project called for building out two apartment condo units above an operational brewery to be used as short-term rentals. Our team executed a complete renovation of the second floor of an existing historic building in downtown Mount Airy. The scope of work transformed the 3,000-square-foot vacant space into a total of four bedrooms, four full bathrooms, two large kitchens, and ample living space. With high-end features such as quartz countertops in the kitchen areas, custom glass vanity tops in the bathrooms, and marble shower walls create an amazing space that is incorporated along with the century-old floor that was restored and refinished. Modern building codes required a sprinkler system that was incorporated around the original exposed brick and beam construction that the owner wanted to preserve. Major trades involved included mechanical, plumbing, electrical, and fire suppression, along with providing meticulous attention to the hardwood flooring restoration, imported bathroom tile, numerous high-end finishes, and custom wood trim throughout. The project welcomed the first tenants in May 2022, and both units have been rented out at a staggering occupancy rate since opening for short-term rentals. www.staymountairy.com
Continue Reading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce elementum, eros et scelerisque hendrerit.

categories

  • No categories

subscribe newletter