What We Offer
A building is not finished when the punch list clears. It is finished when you can operate it. Commissioning is the difference between handing over a set of keys and handing over a working facility.
Systems proven against the design intent before the owner takes possession.
Construction and commissioning, then certificate of occupancy and owner occupancy.
Experience across healthcare, laboratory and public buildings where turnover is inspected, not declared.
The gap between a contractor saying a building is done and an owner being able to run it is where most handover disputes live. Closing it means proving performance rather than asserting it.
The handover package and the process behind it.
HVAC, electrical, plumbing, controls and life safety verified against the design intent, with results documented.
Deficiencies identified, tracked and closed out, with the owner's own walkthrough built into the schedule rather than bolted on.
Authority inspections coordinated against the schedule, including fire marshal review where rated assemblies or egress changed.
The approvals sequence managed through to the certificate, so the occupancy date is a plan rather than a hope.
As-builts, warranties, operation and maintenance manuals and equipment data, assembled during the work.
Facilities staff walked through the systems they are taking on, so the building can be operated and maintained from day one.
Commissioning that starts at the end is already late. These stages overlap construction deliberately.
What will be tested, against what criteria and when, agreed while there is still time to build around it.
Equipment started, balanced and tested as areas complete, so problems surface in sequence rather than all at once.
Warranties, as-builts and manuals collected as trades complete rather than chased after demobilization.
Joint walk, tracked list, and closure of deficiencies before the occupancy date rather than after it.
Authority inspections coordinated and cleared through to the certificate.
Facilities staff trained on the systems, package delivered, building handed over ready to operate.
A point of contact after occupancy for items that emerge once the building is genuinely in use.
Some buildings cannot simply be occupied when construction ends. Clinical space returning to service may carry licensure requirements. A laboratory cannot be used until the owner has validated it, which means the contractor's closeout has to line up with the owner's validation protocol rather than run parallel to it. Public buildings answer to fire marshal review on any change to a rated assembly or egress path.
Hayco has delivered turnover in all three environments. Detail is on the healthcare, laboratory and institutional pages.
Related delivery structures: commissioning sits at the end of a design-build or general construction contract, and facility maintenance picks up once the building is occupied.
During construction, not at the end. The commissioning plan is set while there is still time to build around it, and systems are verified as areas complete rather than all at once in the final week.
As-builts, warranties, operation and maintenance manuals, equipment data, and training for the facilities staff who will run the building.
Hayco does, as part of the contract. Authority inspections are sequenced against the schedule, including fire marshal review where rated assemblies or egress paths changed.
There is a warranty period with a point of contact for items that only emerge once the building is genuinely in use. Most of what would otherwise appear there is caught during commissioning.
Tell us the building, the systems and the date. A preconstruction lead will follow up on how turnover gets sequenced to protect it.