What We Offer
Almost every expensive surprise in commercial construction was knowable earlier. Preconstruction is the work of finding those things while they are still cheap to fix.
Site evaluation, programming, budgeting and approvals work, done before a commitment is made.
Hayco runs a defined process from understanding requirements through owner occupancy.
Zoning, utility and permitting experience across NC, SC, Virginia, Tennessee and Georgia.
By the time drawings are complete, most of a project's cost is already locked. The site is chosen, the size is set, the systems approach is fixed. Preconstruction is the only phase where those are still open, and it is the cheapest phase to spend money in.
These services can be engaged on their own, or as the front end of a design-build or general construction project.
What the building has to do, who occupies it, how the operation runs and what it cannot tolerate. Everything downstream is derived from this.
Identifying and evaluating candidate sites against the operational requirement, and supporting acquisition once one is chosen.
Comparative assessment of shortlisted sites, including the constraints that are far cheaper to discover now than after purchase.
Translating the operational requirement into space, adjacency and capacity so the design starts from something real.
What the jurisdiction permits, what it requires and what it will take to change, mapped against the schedule.
Utility capacity and connection routes, plus access and traffic implications that frequently drive both cost and approval timelines.
Cost modeling against the actual constraints, so the budget survives contact with a drawing set.
Permitting and review cycles built into a schedule rather than assumed away, working backwards from the date you need to occupy.
The first four stages of Hayco's published nine-stage process are preconstruction. They exist to make the remaining five predictable.
The conversation about what the building is for. Done properly it removes more cost than any value engineering exercise later.
Candidate sites assessed against the requirement, including existing buildings where reuse is on the table.
What the jurisdiction allows and what the approval path looks like, with the review calendar mapped against your date.
Capacity, connection and access. These are the two areas most likely to make an otherwise good site unworkable.
A tested budget and a schedule built backwards from occupancy, carried through all four stages so the decision to proceed is made on real numbers. It runs alongside the stages rather than following them.
Preconstruction should end with a decision, not a document nobody reads. The output is a site recommendation you can defend, a program that reflects how your operation actually works, a budget tested against real constraints, and a schedule that accounts for the approval bodies rather than assuming them away.
If the answer is that the project does not work as conceived, that is a successful preconstruction outcome. It is considerably cheaper to learn it here.
From there the project usually continues as design-build, with Hayco carrying the design team, or as general construction if you are holding the design contract yourself.
Yes. Site selection, programming, budget development and approvals mapping can be engaged on their own. Many owners use preconstruction precisely to decide whether and how to proceed.
Before the site is fixed, if you can. Zoning, utility capacity and access decide feasibility, and those are the questions that are cheapest to answer before an acquisition rather than after.
Hayco offers site selection and acquisition support, evaluating candidate sites against the operational requirement and the constraints that determine what can actually be built there.
Then it has done its job. Finding out at this stage costs a fraction of finding out after purchase, design or mobilization.
That is exactly the right moment to call. Tell us the requirement, the sites you are considering and the date you need to occupy.