{
 "builder": "Hayco Construction, LLC",
 "url": "https://hayco-construction.com",
 "count": 28,
 "projects": [
  {
   "title": "American Leadership Academy, Monroe",
   "url": "https://hayco-construction.com/project/american-leadership-academy-monroe/",
   "markdown": "https://hayco-construction.com/project/american-leadership-academy-monroe.md",
   "sector": "Institutional",
   "location": "Monroe, NC",
   "size": "35,000 sq ft on 10 acres",
   "client": "School House Development",
   "delivery": "Design-Build",
   "summary": "A two-story classroom building and a stand-alone gymnasium with a dining hall, added to a K–8 charter school campus in Monroe, North Carolina."
  },
  {
   "title": "Morning Star Academy & SC Construction Academy",
   "url": "https://hayco-construction.com/project/morning-star-academy-myrtle-beach/",
   "markdown": "https://hayco-construction.com/project/morning-star-academy-myrtle-beach.md",
   "sector": "Institutional",
   "location": "Myrtle Beach, SC",
   "client": "The Educational Empowerment Group",
   "delivery": "Design-Build",
   "summary": "The renovation and expansion of an existing building into a K–12 charter school campus in Myrtle Beach, South Carolina, with a construction lab for skilled-trades training."
  },
  {
   "title": "Next Generation Academy",
   "url": "https://hayco-construction.com/project/next-generation-academy/",
   "markdown": "https://hayco-construction.com/project/next-generation-academy.md",
   "sector": "Institutional",
   "location": "Greensboro, NC",
   "client": "Next Generation Academy",
   "delivery": "Design-Build",
   "summary": "An expansion and renovation of a K–8 charter school in Greensboro, North Carolina, adding classrooms, a dining hall with a theatre stage and an e-sports center."
  },
  {
   "title": "Wake Forest University Campus Renovations",
   "url": "https://hayco-construction.com/project/wake-forest-university-campus-renovations/",
   "markdown": "https://hayco-construction.com/project/wake-forest-university-campus-renovations.md",
   "sector": "Institutional",
   "location": "Winston-Salem, NC",
   "client": "Wake Forest University",
   "delivery": "Design-Bid-Build",
   "summary": "Restroom, classroom and conference room renovations on Wake Forest University's campus in Winston-Salem, North Carolina."
  },
  {
   "title": "The Lofts at Whitaker Park",
   "url": "https://hayco-construction.com/project/the-lofts-at-whitaker-park/",
   "markdown": "https://hayco-construction.com/project/the-lofts-at-whitaker-park.md",
   "sector": "Mixed Use",
   "location": "Winston-Salem, NC",
   "size": "235,000 sq ft",
   "client": "Frye Properties",
   "summary": "153 apartments in an 80-year-old former R.J. Reynolds tobacco factory in Winston-Salem, North Carolina, converted for Frye Properties."
  },
  {
   "title": "Penske, Concord",
   "url": "https://hayco-construction.com/project/penske-concord/",
   "markdown": "https://hayco-construction.com/project/penske-concord.md",
   "sector": "Industrial",
   "location": "Concord, NC",
   "size": "27,000 sq ft on 16 acres",
   "client": "Penske Truck Leasing",
   "delivery": "Construction Manager at Risk",
   "summary": "A ground-up truck leasing facility in Concord, North Carolina, with a retail center, offices, a multi-bay shop, fuel islands and 15 acres of paving."
  },
  {
   "title": "Appalachian State University Campus Store Renovation",
   "url": "https://hayco-construction.com/project/app-state-bookstore/",
   "markdown": "https://hayco-construction.com/project/app-state-bookstore.md",
   "sector": "Institutional",
   "location": "Boone, NC",
   "size": "15,000+ sq ft",
   "client": "APP STATE BOOKSTORE",
   "summary": "A comprehensive renovation of the first-floor retail and service space at the heart of App State's campus, built to grow the sales that fund student scholarships."
  },
  {
   "title": "Roess and Trivette Dining Hall",
   "url": "https://hayco-construction.com/project/roess-and-trivette-dining-hall/",
   "markdown": "https://hayco-construction.com/project/roess-and-trivette-dining-hall.md",
   "sector": "Institutional",
   "location": "Boone, NC",
   "size": "6,500 sq. ft.",
   "client": "Appalachian State University",
   "delivery": "Design-Bid-Build",
   "summary": "Renovations to Appalachian State University's Roess and Trivette dining halls in Boone, North Carolina, finished in one summer for the university's move to All Access dining."
  },
  {
   "title": "Surry County Aircraft Hangar",
   "url": "https://hayco-construction.com/project/surry-county-aircraft-hangar/",
   "markdown": "https://hayco-construction.com/project/surry-county-aircraft-hangar.md",
   "sector": "Aviation",
   "location": "Mount Airy, North Carolina",
   "size": "8,000 sq. ft.",
   "client": "SURRY COUNTY",
   "summary": "This new 8,000 square-foot facility features a 600 square-foot office and lounge area, complete with modern amenities such as a hydraulic hangar door, epoxy flooring, and infrared heaters. It was designed to support the growing aviation needs of the region and reflects Hayco’s commitment to enhancing Surry County’s aviation infrastructure."
  },
  {
   "title": "Penske, Greensboro",
   "url": "https://hayco-construction.com/project/penske-greensboro/",
   "markdown": "https://hayco-construction.com/project/penske-greensboro.md",
   "sector": "Industrial",
   "location": "Greensboro, NC",
   "size": "22,600 sq. ft.",
   "client": "PENSKE",
   "summary": "New building boasting approximately 22,600 square feet built for large logistics client to include office space, a shop area, truck wash bay and fuel island."
  },
  {
   "title": "Thirsty Souls",
   "url": "https://hayco-construction.com/project/thirsty-souls/",
   "markdown": "https://hayco-construction.com/project/thirsty-souls.md",
   "sector": "Mixed Use",
   "location": "Mount Airy, NC",
   "size": "3,000 sq. ft.",
   "client": "THIRSTY SOULS",
   "summary": "This upfit project called for building out two apartments above an operational brewery, to be used as short-term rentals."
  },
  {
   "title": "Allegacy Federal Credit Union, Mocksville",
   "url": "https://hayco-construction.com/project/allegacy-federal-credit-union-mocksville/",
   "markdown": "https://hayco-construction.com/project/allegacy-federal-credit-union-mocksville.md",
   "sector": "Retail",
   "location": "Mocksville, North Carolina",
   "size": "2,000 sq. ft.",
   "client": "ALLEGACY FEDERAL CREDIT UNION",
   "summary": "Allegacy Federal Credit Union is an interior upfit of its newest location in Mocksville, North Carolina."
  },
  {
   "title": "App State Career Development Center",
   "url": "https://hayco-construction.com/project/app-state-career-center/",
   "markdown": "https://hayco-construction.com/project/app-state-career-center.md",
   "sector": "Institutional",
   "location": "Boone, NC",
   "size": "5,800 sq. ft.",
   "client": "APP STATE CAREER CENTER",
   "summary": "Hayco continued its ongoing partnership with Appalachian State University by renovating approximately 5,800 square feet of its Career Development Center on the 2nd floor of the Plemmons Student Union and Solarium."
  },
  {
   "title": "ATS Logistics, Inc.",
   "url": "https://hayco-construction.com/project/ats-logistics-inc/",
   "markdown": "https://hayco-construction.com/project/ats-logistics-inc.md",
   "sector": "Industrial",
   "location": "North Charleston, SC",
   "size": "12,000 sq. ft.",
   "client": "ATS LOGISTICS, INC.",
   "summary": "This project scope of work consists of renovations, repairs and upgrades to an existing Pre-Engineered Metal Building(PEMB) for the purposes of being used as an OTR Tractor-Trailer Maintenance and Service Shop."
  },
  {
   "title": "Capital Animal Hospital",
   "url": "https://hayco-construction.com/project/capital-animal-hospital/",
   "markdown": "https://hayco-construction.com/project/capital-animal-hospital.md",
   "sector": "Healthcare",
   "location": "Columbia, SC",
   "size": "3,425 sq. ft.",
   "client": "CAPITAL ANIMAL HOSPITAL",
   "summary": "This project is for the addition of a new Surgery Suite as well as around 2,500 square feet of interior renovations to an existing veterinarian animal hospital."
  },
  {
   "title": "Penske, Charleston",
   "url": "https://hayco-construction.com/project/penske-charleston/",
   "markdown": "https://hayco-construction.com/project/penske-charleston.md",
   "sector": "Industrial",
   "location": "Charleston, South Carolina",
   "size": "20,000 sq. ft.",
   "client": "PENSKE",
   "summary": "Responsible for the construction of a logistics center for a transport service provider that manages businesses with revenues in excess of $26 billion, operating in more than 3,300 locations and employing over 50,000 people worldwide."
  },
  {
   "title": "Altec",
   "url": "https://hayco-construction.com/project/altec/",
   "markdown": "https://hayco-construction.com/project/altec.md",
   "sector": "Industrial",
   "location": "Mount Airy, North Carolina",
   "size": "35,000 sq. ft.",
   "client": "ALTEC",
   "summary": "Responsible for the interior office renovations and the addition of two new floors to a leading provider of electric utilities and telecommunications that services more than 100 countries worldwide."
  },
  {
   "title": "Surry County Judicial Center",
   "url": "https://hayco-construction.com/project/surry-county-judicial-center/",
   "markdown": "https://hayco-construction.com/project/surry-county-judicial-center.md",
   "sector": "Institutional",
   "location": "Dobson, North Carolina",
   "size": "37,000 sq. ft.",
   "client": "SURRY COUNTY JUDICIAL CENTER",
   "summary": "Cosmetic renovations to the historic Surry County Judicial Center that was originally built in 1919."
  },
  {
   "title": "Allegacy Federal Credit Union, Winston-Salem",
   "url": "https://hayco-construction.com/project/allegacy-federal-credit-union-winston-salem/",
   "markdown": "https://hayco-construction.com/project/allegacy-federal-credit-union-winston-salem.md",
   "sector": "Retail",
   "location": "Winston Salem, North Carolina",
   "size": "6,100 sq. ft.",
   "client": "ALLEGACY FEDERAL CREDIT UNION",
   "summary": "Trusted with the interior renovations of a financial institution that has been serving North Carolina since 1967."
  },
  {
   "title": "Cone Health at Forest Oaks",
   "url": "https://hayco-construction.com/project/cone-health-at-forest-oaks/",
   "markdown": "https://hayco-construction.com/project/cone-health-at-forest-oaks.md",
   "sector": "Healthcare",
   "location": "Greensboro, NC",
   "client": "CONE HEALTH AT FOREST OAKS",
   "summary": "Responsible for the demolition and renovation of offices for medical facility."
  },
  {
   "title": "Cone Health Mebane Surgery Center",
   "url": "https://hayco-construction.com/project/cone-health-mebane-surgery-center/",
   "markdown": "https://hayco-construction.com/project/cone-health-mebane-surgery-center.md",
   "sector": "Healthcare",
   "location": "Mebane, NC",
   "size": "1,900 sq. ft.",
   "client": "CONE HEALTH MEBANE SURGERY CENTER",
   "summary": "Responsible for the addition of: new restrooms, a meeting room, and a workout room."
  },
  {
   "title": "Alamance Regional Medical Center",
   "url": "https://hayco-construction.com/project/alamance-regional-medical-center/",
   "markdown": "https://hayco-construction.com/project/alamance-regional-medical-center.md",
   "sector": "Healthcare",
   "location": "Burlington, NC",
   "size": "2,500 sq. ft.",
   "client": "ALAMANCE REGIONAL MEDICAL CENTER"
  },
  {
   "title": "Greensboro ENT",
   "url": "https://hayco-construction.com/project/greensboro-ent/",
   "markdown": "https://hayco-construction.com/project/greensboro-ent.md",
   "sector": "Healthcare",
   "location": "Greensboro, NC",
   "size": "3,500 sq. ft.",
   "client": "GREENSBORO ENT",
   "summary": "Responsible for an upfit of a current medical office."
  },
  {
   "title": "Laboratory Corporation of America, Chesapeake",
   "url": "https://hayco-construction.com/project/laboratory-corporation-of-america-chesapeake/",
   "markdown": "https://hayco-construction.com/project/laboratory-corporation-of-america-chesapeake.md",
   "sector": "Healthcare, Laboratory",
   "location": "Chesapeake, Virginia",
   "size": "16,700 sq. ft.",
   "client": "LABORATORY CORPORATION OF AMERICA",
   "summary": "Responsible for the facility renovations of a new LabCorp location"
  },
  {
   "title": "Forsyth Technical Community College",
   "url": "https://hayco-construction.com/project/forsyth-technical-community-college/",
   "markdown": "https://hayco-construction.com/project/forsyth-technical-community-college.md",
   "sector": "Institutional",
   "location": "Winston-Salem, NC",
   "size": "3,500 sq. ft.",
   "client": "Forsyth Technical Community College",
   "summary": "Tasked with the interior renovations of the nanotechnology laboratories for a leading provider of education that services more than 11,000 students every day."
  },
  {
   "title": "Laboratory Corporation of America, Asheboro",
   "url": "https://hayco-construction.com/project/laboratory-corporation-of-america-asheboro/",
   "markdown": "https://hayco-construction.com/project/laboratory-corporation-of-america-asheboro.md",
   "sector": "Healthcare, Laboratory",
   "location": "Asheboro, NC",
   "size": "4,500 sq. ft.",
   "client": "LABORATORY CORPORATION OF AMERICA",
   "summary": "Trusted with the upfit of a new patient service center and accessioning lab."
  },
  {
   "title": "American Spiral Weld Pipe Expansion",
   "url": "https://hayco-construction.com/project/american-spiral-weld-pipe/",
   "markdown": "https://hayco-construction.com/project/american-spiral-weld-pipe.md",
   "sector": "Industrial",
   "location": "Columbia, SC",
   "size": "55,000 sq ft on 5 acres",
   "client": "American Spiral Weld Pipe",
   "summary": "A new 55,000-square-foot manufacturing building in Columbia, South Carolina, that lets American Spiral Weld Pipe add product lines to its existing plant."
  },
  {
   "title": "BayFront Craven Industrial Building",
   "url": "https://hayco-construction.com/project/bayfront-craven-industrial/",
   "markdown": "https://hayco-construction.com/project/bayfront-craven-industrial.md",
   "sector": "Industrial",
   "location": "New Bern, NC",
   "size": "20,000 sq ft on 6 acres",
   "client": "BayFront Craven LLC",
   "summary": "A 20,000-square-foot industrial building in New Bern, North Carolina, started as a speculative building and finished for a new owner with office, manufacturing and distribution space."
  }
 ]
}